| No |
Project Proponent |
Project Name |
Documents |
Status |
| 1 |
PT Indocement Tunggal Prakarsa |
Indocement Alternative Fuels Project |
|
First Issuance CER |
| 2 |
PT Indocement Tunggal Prakarsa |
Indocement Blended Cement Project |
|
Request for first CER Issuance |
| 3 |
PT Multimas Nabati Asahan |
MNA Biomass 9.7 MWe Condensing Steam Turbine |
|
Monitoring Report Made Public ( 31 Aug 06-30 Sep 08) |
| 4 |
PT Murini Samsam (MSS)
|
MSS Biomass 9.7 MWe Condensing Steam Turbine |
|
Monitoring Report Made Public ( 01 Aug 06-30 Sep 08) |
| 5 |
PT Petromat Agrotech |
CDM Solar Cooker Project Aceh 1 |
|
CER Issuance |
| 6 |
PT Indotirta Suaka |
Methane Capture and Combustion from Swine Manure Treatment Project |
|
CER Issuance |
| 7 |
Chevron Geothermal Indonesia Ltd. |
Darajat Unit III Geothermal Project |
|
CER Issuance |
| 8 |
EcoSecurities Indonesia |
Biogas Lampung Bekri Project |
|
REGISTERED at EB |
| 9 |
BPPT & Climate Interchange, AG |
Cook Stove Kupang Project 1 |
PDD
Approval Letter |
DNA Approved |
| 10 |
PT Navigat Organic Energy Indonesia |
Navigat Organic Energy Indonesia |
PDD
Approval Letter |
REGISTERED at EB |
| 11 |
PT Medco Energi Oil & Gas |
Medco Energi Associated Gas Recovery and Utilization Project |
PDD
Approval Letter |
DNA Approved |
| 12 |
PT Cargill Indonesia
EcoSecurities |
Amurang Biomass Cogeneration Project |
|
REGISTERED at EB |
| 13 |
PT Multi Nitrotama Kimia
Sindicatum Carbon Capital Ltd |
Multi Nitro, Indonesia Nitrous Oxide Abatement Project |
PDD
Approval Letter |
REGISTERED at EB on 12 April 2009 |
| 14 |
PT Indonesia Power
Agency for the Assessment and Application of
Technology (BPPT)
The Chugoku Electric Power Co., Inc. |
Siteki, Plumbungan, Ketenger #4 and Cileunca
Hydroelectric Power Project in Indonesia |
PDD
Approval Letter |
DNA Approved |
| 15 |
PT BUDI ACID JAYA (BAJ)
SUMITOMO |
Tapioca Starch Production Facilities Effluent Methane Extraction And On-site Power Generation Project in Lampung Province, Republic of Indonesia |
PDD
Approval Letter |
REGISTERED at EB |
| 16 |
PT Odira Energy Persada
Sindicatum Carbon Capital Ltd. |
Tambun LPG Associated Gas Recovery and Utilization Project |
PDD
Approval Letter |
monitoring report for the period 21 September 2008 to 15 February 2009 |
| 17 |
Permata Hijau Group
Mitsubishi UFJ Securities Co., Ltd. |
Nagamas Biomass Cogeneration Project in Indonesia |
PDD
Approval Letter |
monitoring report for the period 23 November 2007 to 31 December 2008 |
| 18 |
PT Holcim Indonesia Tbk
Holcim Group Support Ltd |
Emission reductions through partial substitution of fossil fuel with alternative fuels in the 2 cement plants
of PT Holcim Indonesia Tbk. |
PDD
Approval Letter |
DNA Approved |
| 19 |
PT Manunggal Energi Nusantara
Mitsubishi UFJ Securities Co. Ltd. |
MEN-Tangerang 13.6MW Natural Gas Co-generation Project |
PDD
Approval Letter |
ISSUANCE of 17,154 CERs |
| 20 |
PT Intibenua Perkasatama |
PTIP Biomass to Electricity Project (7 MW) |
PDD
Approval Letter |
DNA Approved |
| 21 |
PT Sumi Rubber Indonesia (SURINDO)
PT Nusantara Energy Solution (NES)
Toshiba Corporation (TOSHIBA) |
Gas turbine co-generation project in Indonesia |
PDD
Approval Letter |
REGISTERED at EB |
| 22 |
PT Fajar Futura Energi Luwu
Centre for Application and Assessment of Energy Resources Technology, Agency for the Application and Assessment of Technology (BPPT)
The Chugoku Electric Power Co., Inc.
Kajima Corporation |
Ranteballa Hydroelectric Power Project in Indonesia |
PDD
Approval Letter |
DNA Approved |
| 23 |
PT Musim Mas |
PTMM Biomass to Electricity Project 26.4 MW(e) |
PDD
Approval Letter |
DNA Approved |
| 24 |
PT Gikoko Kogyo Indonesia
The Municipal Government of the City of Pontianak, Kalimantan Barat, Indonesia
IBRD (Netherlands) |
Pontianak-GHG emission recuction through improved MSW management-LFG Capture, Flaring, and Electricity Generation |
PDD
Approval Letter |
REGISTERED at EB |
| 25 |
PT Listrindo Kencana
PT Sawindo Kencana
Misubishi UFJ Securities |
Listrindo Kencana Biomass Power Plant |
PDD
Approval Letter |
REGISTERED at EB |
| 26 |
PT Bahari Dwikencana Lestari
EcoSecurities Group Plc. |
Bahari Co-Composting Project |
PDD
Approval Letter |
DNA Approved |
| 27 |
PLN (Perusahaan Listrik Negara) |
Lahendong II-20 MW Geothermal Project |
PDD
Approval Letter |
DNA Approved |
| 28 |
PT Rimba Partikel Indonesia |
4 MW Biomass Power Plants, Using Waste Wood Chips & Saw Dust |
PDD
Approval Letter |
REGISTERED at EB |
| 29 |
PT Poso Energi |
Pamona 2 Hydroelectric Power Plant Project |
PDD
Approval Letter |
DNA Approved |
| 30 |
PT Mega Power Mandiri |
Parlilitan 1 Hydro Power Plant |
PDD
Approval Letter |
DNA Approved |
| 31 |
PT Patisari |
Patisari Co-composting Project |
PDD
Approval Letter |
DNA Approved |
| 32 |
PT AES AgriVerde Indonesia |
Methane Recovery in Wastewater Treatment, Project AIN07-W-01, Sumatera Utara (North Sumatera), Indonesia |
PDD
Approval Letter |
REGISTERED at EB |
| 33 |
PT Asahimas Flat Glass Tbk., |
Fuel switching at Asahimas Ancol a flat glass manufacturing facility |
PDD
Approval Letter |
DNA Approved |
| 34 |
PT Asahimas Flat Glass Tbk., |
Fuel switching at Asahimas Sidoarjo a flat glass manufacturing facility |
PDD
Approval Letter |
DNA Approved |
| 35 |
PT Gikoko Kogyo Indonesia |
Gikoko Palembang-LFG Flaring Project |
PDD
Approval Letter |
DNA Approved |
| 36 |
PT Fetty Mina Jaya |
Fetty Mina Co-composting Project |
PDD
Approval Letter |
DNA Approved |
| 37 |
PT AES AgriVerde Indonesia , Project AIN07-W-04 & PT Victorian Alam Lestari |
Methane Recovery in wasterwater treatment, Project AIN07-W-04 |
PDD
Approval Letter |
REGISTERED at EB |
| 38 |
PT Great Giant Pineapple (GGP) |
GGP-UJA Biogas Project |
PDD
Approval Letter |
DNA Approved |
| 39 |
PT AES AgriVerde Indonesia & PT Tolan Tiga Indonesia |
Methane Recovery in Wastewater Treatment, Project AIN07-W-05 |
PDD
Approval Letter |
DNA Approved |
| 40 |
Pemda Temesi Bali & Rotary Club Bali Ubud |
Gianyar Waste Recovery Project |
PDD
Approval Letter |
Request for registration |
| 41 |
PT. Rohul Sawit Industri |
Rohul sawit industri co-composting project |
PDD
Approval Letter |
DNA Approved |
| 42 |
PT Windu Nabatindo Lestari & EcoSecurities |
Windu Nabatindo Lestari Co-compostin Project |
PDD
Approval Letter |
DNA Approved |
| 43 |
PT Karya Makmur Bahagia & EcoSecurities |
Karya Makmur Bahagia co-composting project |
PDD
Approval Letter |
DNA Approved |
| 44 |
PT Pura Barutama & NEDO |
Partial Fuel Switching From Coal to Biomass Residues (Rice Husk and Saw Dust) in Boilers for Electricity and Heat Generation |
PDD
Approval Letter |
DNA Approved |
| 45 |
PT Pelita Agung Agriindustri & Mitsubishi UFJ |
PAA Biogas Extraction Project for Heat Generation |
PDD
Approval Letter |
Could not be registered |
| 46 |
Pemkot Bekasi & PT Gikoko Kogyo Indonesia & IBRD |
Gikoko Bekasi- LFG Flaring Project |
PDD
Approval Letter |
DNA Approved |
| 47 |
Pemkot Makassar & PT Gikoko Kogyo Indonesia |
Gikoko Makassar-LFG Flaring Project |
PDD
Approval Letter |
DNA Approved |
| 48 |
PT Gandaerah Hendana
PT Enviro Mitra Abadi
EcoSecurities Group Plc. |
Gandaerah Hendana Co-Composting Project |
PDD
Approval Letter |
DNA Approved |
| 49 |
PT Adei Plantation & Industry |
Mandau Biomass Power Plant |
PDD
Approval Letter |
DNA Approved |
| 50 |
PT Manunggal Energi Nusantara |
MEN Energy Efficiency Improvement Project |
PDD
Approval Letter |
REGISTERED at EB (15 Feb 09) |
| 51 |
PT Perusahaan Listrik Negara (PLN)
PT PERTAMINA |
Kamojang Geothermal |
PDD
Approval Letter |
DNA Approved |
| 52 |
PT Pelita Agung Agrindustri & Mitsubishi UFJ Securities Co. Ltd. |
Pelita Agung Agridustri Biomass Cogeneration Plant |
PDD
Approval Letter |
DNA Approved |
| 53 |
PT. Indo Karya Kimia |
Utilization of waste heat from Sulphur Recovery Unit to generate electricity |
PDD
Approval Letter |
DNA Approved |
| 54 |
PT. Indo Bharat Rayon |
Energy efficiency improvement by installation of Circulating Fluidized Bed Combustion (CFBC) Boiler and Back Pressure Turbine at PT. Indo Bharat Rayon, Indonesia |
PDD
Approval Letter |
DNA Approved |
| 55 |
PT. Batamindo Investment Cakrawala & PT. Asia Carbon Indonesia |
Fuel Switch for Power Generation form Heavy Fuel Oil (HFO) Based Engines to Natural Gas (NG) Based Engines at Batamindo Industrial Park (BIP), Batam, Indonesia |
PDD
Approval Letter |
DNA Approved |
| 56 |
PT. Sulawesi Mini Hydro Power |
10 MW Manipi Hydro Electric Power Plant |
PDD
Approval Letter |
DNA Approved |
| 57 |
PT. AES AgriVerde Indonesia & AES AgriVerde Ltd. |
AIN08-W-07, Methane Recovery in Wastewater Treatment, Sumatera Utara, Indonesia |
PDD
Approval Letter |
DNA Approved |
| 58 |
PT. AES AgriVerde Indonesia & AES AgriVerde Ltd. |
AIN08-W-06. Methane Recovery in Wastewater Treatment, Sumatera Utara, Indonesia |
PDD
Approval Letter |
DNA Approved |
| 59 |
PT. Indonesia Asahan Aluminium & South Pole Carbon Asset Management Ltd & PT. Carbon and Environmental Research |
PCF Emission Reductions at PT. Indonesia Asahan Aluminium (PT. INALUM) Kuala Tanjung |
PDD
Approval Letter |
DNA Approved |
| 60 |
PT. Citra Koprasindo Tani |
Operating Waste Composting at CKT Palm Oil Mill, Indonesia |
PDD
Approval Letter |
DNA Approved |
| 61 |
PT. Prakarsa Tani Sejati & Aretae Limited |
Operating Waste Composting at PTS Palm Oil Mill, Indonesia |
PDD
Approval Letter |
DNA Approved |
| 62 |
PT. AES AgriVerde Indonesia & AES AgriVerde Ltd. |
AIN08-W-03. Methane Recovery in Wastewater Treatment, Sumatera Utara, Indonesia |
PDD
Approval Letter |
DNA Approved |
| 63 |
PT. BUDI ACID JAYA (BAJ) |
Methane avoidance through utilisation of anaerobic reactor for wastewater treatment at tapioca Starch factories |
PDD
Approval Letter |
DNA Approved |
| 64 |
PT Harapan Sawit Lestari, Cargill International SA & EcoSecurities Group Plc. |
Harapan Biogas Project |
PDD
Approval Letter |
DNA Approved |
| 65 |
PT Nubika Jaya & Mitsubishi UFJ Securities Co. Ltd. |
Nubika Jaya Biogas Extraction for Bio-Hydrogen Production |
PDD
Approval Letter |
Request for registration (automatic registration on 15 May 09) |
| 66 |
PT CABOT INDONESIA (PTCI) |
Utilization of heat content of tail gas at PT Cabot Indonesia, Cilegon |
PDD
Approval Letter |
DNA Approved |
| 67 |
PT Indo Matra Power & Sindicatum Carbon Capital |
Kabil II 11.4 MW Gas Fired Project |
PDD
Approval Letter |
Request for review of request for registration for proposed CDM activity |
| 68 |
PT Asta Keramasan Energi, Climate Change Capital Carbon Fund 2 SARL, Climate Change Capital Carbon Managed Account SARL |
PT ASTA Kerasaman Energi - 145 MW new build CCGT |
PDD
Approval Letter |
DNA Approved |
| 69 |
PT Cahaya Kalbar Tbk (CK) |
CK Biomass 2.4 MWe Condensing Steam Turbine Project |
PDD
Approval Letter |
DNA Approved |
| 70 |
PT Bukit Kapur Reksa (BKR) |
BKR Biomass 4 MWe Condensing Steam Turbine Project |
PDD
Approval Letter |
DNA Approved |
| 71 |
PT Bridegestone Tire Indonesia & Bridegestone Corporation |
Energy efficiency through gas turbine co-generation in Indonesia |
|
DNA Approved (February 2009) |
| 72 |
PT Titis Sampurna & Sindicatum Carbon Capital Ltd. |
Titis Sampurna Semanggi Compressed Natural Gas Project |
|
DNA Approved (February 2009) |
| 73 |
PT Budi Acid Jaya & Cargill International SA |
Biogas Project, BAJ Unit 6 |
|
DNA Approved (February 2009) |
| 74 |
PT Budi Acid Jaya & Cargill International SA |
Biogas Project, BAJ Way Jepara |
|
DNA Approved (February 2009) |
| 75 |
PT Budi Acid Jaya & Green Hercules Trading Limited |
Biogas Project, BAJ Terbanggi |
|
DNA Approved (February 2009) |
| 76 |
PT AES Agriverde Indonesia |
ID08-WWP-11, Methane Recovery in Wastewater Treatment, Jambi, Indonesia |
|
DNA Approved (February 2009) |
| 77 |
PT AES Agriverde Indonesia |
ID08-WWP-10, Methane Recovery in Wastewater Treatment, West Sumatera, Indonesia |
|
DNA Approved (February 2009) |
| 78 |
PT AES Agriverde Indonesia |
ID08-WWP-09, Methane Recovery in Wastewater Treatment, Aceh, Indonesia |
|
DNA Approved (February 2009) |
| 79 |
PT Kriya Swarna Pubian |
Co-composting of EFB and POME at PT. Kriya Swarna Pubian in Lampung |
|
DNA Approved (February 2009) |
| 80 |
PT Sabut Mas Abadi |
Co-composting of EFB and POME in Sekernan, Indonesia |
|
DNA Approved (February 2009) |
| 81 |
PT Dizamatara Powerindo |
Sibayak Geothermal Power Plant |
|
DNA Approved (February 2009) |
| 82 |
PT NGK Ceramics Indonesia |
Factory energy efficiency improvement in ceramic kiln fuel usage in Indonesia |
|
DNA Approved (February 2009) |
| 83 |
PT. AES AgriVerde Indonesia |
ID08-WWP-14, Methane Recovery in Wastewater Treatment Riau Province, Indonesia |
|
DNA Approved (February 2009) |
| 84 |
PT. AES AgriVerde Indonesia |
ID08-WWP-15, Methane Recovery in Wastewater Treatment North Sumatera, Indonesia |
|
DNA Approved (February 2009) |
| 85 |
PT. AES AgriVerde Indonesia |
ID08-WWP-16, Methane Recovery in Wastewater Treatment Bangka Belitung, Indonesia |
|
DNA Approved (February 2009) |
| 86 |
PT. Budi Acid Jaya (BAJ) |
BAJ Gunung Agung Factory tapioca starch wastewater biogas extraction and utilization project, Lampung Province, Indonesia |
|
DNA Approved (February 2009) |
| 87 |
PT. Budi Acid Jaya (BAJ) |
BAJ Pakuan Agung Factory tapioca starch wastewater biogas extraction and utilization project, Lampung Province, Indonesia |
|
DNA Approved (February 2009) |
| 88 |
PT. Budi Acid Jaya (BAJ) |
BAJ Tulang Bawang Factory tapioca starch wastewater biogas extraction and utilization project, Lampung Province, Indonesia |
|
DNA Approved (February 2009) |
| 89 |
PT. Indo Bharat Rayon |
Waste Heat Recovery from WSA Plant at PT Indo Bharat Rayon |
|
DNA Approved (February 2009) |
| 90 |
Perusahaan Listrik Negara (PLN) |
Lahendong III – 20 MW Geothermal Power Plant Project |
|
DNA Approved (February 2009) |
| 91 |
PT. Erna Djuliawati |
West Kalimantan Biomass Co-generation Project |
|
|
| 92 |
PT. Nikmat Halona Reksa |
NHR Co-Composting Project |
Approval Letter |
|
| 93 |
BPPT & Shimizu Corporation |
Piyungan Landfill Gas Capture Project in Yogyakarta |
|
|
| 94 |
PT. Jawamanis Rafinasi & AgriEnergy Ltd. |
PT Jawamanis Rafinasi Fuel Switch Project |
|
|
| 95 |
PT. Belitung Energy & PT. Zeus-Innavitas |
Belitung Energy Biomass Power Plant |
|
|
| 96 |
PT. Merbau Jaya Indah Raya |
Merbau Jaya Co-Composting Project |
|
|
| 97 |
PT Austindo Aufwind New Energy & Aufwind Schmack Asia Holding GmbH |
AANE Belitung Biogas Recovery from Palm Oil Mill Effluent (POME) ponds and biogass flaring/utilization |
|
|
| 98 |
PT Gasuma Federal Indonesia, PT Sindicatum Carbon Capital Indonesia & Sindicatum Carbon Capital Ltd. |
Sukowati - Mudi (Tuban) LPG Associated Gas Recovery and Utilization Project |
|
|
| 99 |
PT. Magma Nusantara Limited, PT. Sindicatum Carbon Capital Indonesia & Sindicatum Carbon Capital Ltd. |
Wayang Windu Phase 2 Geothermal Power Project |
|
|
| 100 |
PT National Champignon & EDF Trading |
Grid electricity displacement through biomass gasification in the mushroom industry in Central Java, Indonesia |
|
|
| 101 |
PT Pinago Utama & Nordjysk Elhandel (Denmark) |
Methane Recovery and Utilisation at PT Pinago Utama Sugihwaras Palm Pil Mill, Sumatera, Indonesia |
|
|
| 102 |
PT Jembo Citra Energindo & Sindicatum Carbon Capital Ltd. (Inggris & Irlandia Utara) |
Jembo II 24 MW Gas Fired Project |
|
|
| 103 |
PT Dayak Eco Carpentry & BGP Engineers B.V. |
Bundled Landfill gas recovery project Indonesia |
PDD
Approval Letter |
|
| 104 |
PT. Bersaudara Simalungun Energi & EDF Trading (Inggris) |
Silau-2 small hydro power plant in North Sumatera Province, Indonesia |
PDD
Approval Letter |
|